Accurately measure the roof and create a roof plan for estimating and ordering roof panels and accessories ensure all required roof penetrations are in place before beginning pluming vents exhaust attic venting etc remove any dirt or debris from.
Westman steel roofing installation guide.
Store sheets in a cool and dry place out of direct sunlight.
Stack short sheets on top of longer ones.
Screw length is to be long enough to penetrate the decking.
Other wall trims and flashings step 8.
Add the metal panels.
For curved cutting use a jigsaw or metal cutting shears.
Underlayment is to be installed over the eave starter.
Take your first sheet of metal and place it on the roof so that it overhangs the edge at least 3 4 in 1 9 cm.
Wall sheeting step 9.
Gable trim after applied step 6.
During cutting secure sheets to ensure clean cuts.
Roof sheets step 4.
Install roof trim flashing and westman steel underlayment step 3.
Simply choose the installation guides appropriate for your project.
Installation consists of the following steps.
Drive through the outside closure and the ribs of the panel beneath.
To prevent solar heat buildup avoid covering the stack of sheets with a dark tarp or other heat absorbing material.
From basic sheet steel cladding to snaplok roofing panels and on to more sophisticated steel shingles with stone coating and even steel spanish tiles.
3 roofing panel install with lower edge overhanging eave edge by at least 1.
Fasten valley in place with clips and fasteners on the outer edge of the valley every 16 on center.
Use a circular saw with a fine tooth blade at a high speed but a low advance rate to cut 3 4 sheets at a time.
Install eave starter at all eaves.
Install base flashing step 7.
Always begin working at the point with the longest peak to eave distance.
5 outside closure install along upper edge of panels about 2 below the edge.
Install ridge cap step 5.
Achieving rooftop architectural expressions is easy with westman roofing products.
All products offer advanced benefits such as long service lives easy installation and little maintenance over traditional roofing materials.
Trim the bottom of the valley to the correct angle and allow 5 8 to bend around the eave starter.
Installation guide handling.
Begin installation on side away from wind rain direction.
Fasten eave starter with 10 x 1 long galvanized zip screws 12 o c.
Installation guide important notes.
Clean sheets of any debris before installation.
Material checklist step 2.
When installing roofing panels take care to avoid walking on the butt of the panels.